The Reporter Magazine
Monday, September 7, 2026
No Result
View All Result
  • Agenda
  • Interview
  • Editorial
  • Features
  • Money Talks
  • Global Addis
  • Economy
  • Travel
  • Art & Culture
  • Op-ed
  • The Month in Brief
  • Commentary
  • Watchdog
  • Sponsored
The Reporter Magazine
No Result
View All Result

Ethiopia weathers US, Egypt pressure over national dam project

GERD construction reaches 72 percent

Birhanu FikadebyBirhanu Fikade
March 31, 2020
Ethiopia weathers US, Egypt pressure over national dam project
Share on FacebookShare on X
ADVERTISEMENT

Following the recent stalemates in the negotiations over the Grand Ethiopian Renaissance Dam (GERD), after Washington ordered Ethiopia not to pursue the storage and filling of the GERD; Ethiopia has been reacting to the US’s conclusions calling it “biased and one sided.”

In an exclusive interview with The Reporter, Sileshi Bekele (PhD), Minister of Water, Irrigation and Energy blamed the US government, the self-turned negotiator represented through the State Department of Treasury, for its unfaithfulness in the last legs of the GERD negotiations.

According to the Minister, despite Ethiopia’s disinterest to request the involvement of a third party in the process, the US via Egypt’s demand, assumed a mediator’s role. Ethiopia stressed the involvement of the US should be limited to a facilitator and an observer’s role, and then agreed to convene in the US brokered talks; which Sileshi recalls as working against the 2015 Declaration of Principles (DoP), Article 10, which Ethiopia had signed together with Sudan and Egypt. Only the three countries have to agree to seek the involvement of a third party when negotiations fail to produce any fruitful outcomes.

RELATED POSTS

Drought Emergency or Seasonal Deficit?

Drought Emergency or Seasonal Deficit?

September 2, 2026
Targeted and Abandoned

Targeted and Abandoned

August 1, 2026

Ethiopia at the Frontline of Global Debt

June 29, 2026

Absentee Ballots, Distant Candidates

June 3, 2026

The Blue Army

May 5, 2026

Wolqait: Where UNCERTAINTY is Too Grave to Overlook

April 7, 2026

However, Egypt as often as it does, breached the agreement and went to Washington without letting Ethiopia and Sudan know of its intentions to involve the US.

During the recent UN assembly, Egypt made a statement about the GERD which Sileshi described as a “special episode” and said “We suspected that they have met with President Donald Trump as we have read in the press. Egypt made its own individualized statement during the UN session. The US government as well made its own statement on the GERD. Since we were provoked, our President Sahlework Zewde has countered those statements during the assembly.”

Earlier, President of Egypt, Abdel Fattah el-Sisi and Prime Minister Abiy (PhD) had met in Russia. But according to Sileshi, a letter was sent to Foreign Minister Gedu Andargachew requesting him to join the Egyptians in Washington and have discussions on the GERD.

“Apparently, President Trump gave the order to his Secretary of Treasury and President of the World Bank Group to seat with the three countries. From our side, during the discussions with President Trump, we explicitly expressed our concerns and also stated our tasks was to hold four rounds of meetings and a deadline, then to conclude the discussions,” Sileshi noted, since that was the agreed upon protocol.

Since November 6, 2019, with a clearly stated and differed stance of Ethiopia, the four meetings went through. The meeting where “The US expressed its interest to provide political support and reviews of the process came-up during the December 9, 2019, January 12 and 13, 2020 meetings.  Those were the processes where we ended up dry, following the interference by the Secretary of Treasury,” Sileshi explained.  

“At first they agreed to remain as observers but later assumed a meditators role and then acted as a decision maker for us. Unfortunately, their decisions were not backed by science and we informed all the US institutions including the WB, that the numbers we initially agreed with the Egyptians were actually put aside and a new detrimental craft of ill-learnt document was independently prepared and was put in front of us to sign,” Sileshi said. 

Nevertheless, the construction of the GERD, Shileshi said is progressing well. Ethiopia is accelerating the construction phase and is approaching to begin storing an initial volume of some 4.9 billion cubic meters of water soon. Water storage is expected to begin by the coming rainy season, in the months of July and August.

“With the stored amount of water, we will start generating and commissioning two turbines by February and March of next year,” said the minister.

The expected level of the water volume to be stored at the dam will reach around 565 meters above sea level. However, the optimal water volume is around 625 meters or higher, as the height of the dam is 640 meters. The storage of the full 700 meter volume will be realized when the volume exceeds 625 meters. However, during the early generation process with the two turbines, which will produce 750 megawatts of electricity; will be when the volume of water stored in the dam reaches 575 meters.

Currently, the GERD has reached a 72 percent total completion stage in the construction process. The electromechanical part of the dam has reached a 42.3 percent completion while the recommenced hydro steel structure component, which had some setbacks in previous undertakings, has reached 20 percent.

Source: The Ethiopian Reporter 
ADVERTISEMENT
Birhanu Fikade

Birhanu Fikade

Related Posts

Drought Emergency or Seasonal Deficit?
Agenda

Drought Emergency or Seasonal Deficit?

September 2, 2026
0

Anyone visiting the social media pages of Ethiopia’s Ministry of Agriculture and its affiliate institutions is greeted with images of vibrant farms with lush crops...

Read moreDetails
Targeted and Abandoned

Targeted and Abandoned

August 1, 2026
Ethiopia at the Frontline of Global Debt

Ethiopia at the Frontline of Global Debt

June 29, 2026
Absentee Ballots, Distant Candidates

Absentee Ballots, Distant Candidates

June 3, 2026
The Blue Army

The Blue Army

May 5, 2026
Wolqait: Where UNCERTAINTY is Too Grave to Overlook

Wolqait: Where UNCERTAINTY is Too Grave to Overlook

April 7, 2026
Ghosts of the Past, Fears of a New War Hollowing Out Tigray

Ghosts of the Past, Fears of a New War Hollowing Out Tigray

March 20, 2026
ADVERTISEMENT

Stay Informed. Stay Ahead

Receive in-depth analysis, breaking news, and exclusive reports from Ethiopia and beyond.

Thank you!

You’re almost there! Confirm your subscription to The Reporter Magazine to start receiving exclusive news, analysis, and insights directly in your inbox.

RECOMMENDED

Behind Ethiopia’s Stalled Iron Ore Mining

Behind Ethiopia’s Stalled Iron Ore Mining

August 31, 2026
Drought Emergency or Seasonal Deficit?

Drought Emergency or Seasonal Deficit?

September 2, 2026
Red Sea Rivalries:  What a Shifting Geopolitical Landscape Means for Ethiopia and The Horn

Red Sea Rivalries: What a Shifting Geopolitical Landscape Means for Ethiopia and The Horn

August 31, 2026
From Unwilling Investors to Bidding Wars: Ethiopia’s T-Bill Market Turns on Its Head

From Unwilling Investors to Bidding Wars: Ethiopia’s T-Bill Market Turns on Its Head

September 3, 2026
High Domestic Costs, Not Tariffs, Limit Impact of Intra-African Trade: World Bank Report

High Domestic Costs, Not Tariffs, Limit Impact of Intra-African Trade: World Bank Report

August 31, 2026

MOST VIEWED

  • Drought Warning Threshold Reached in 114 Ethiopian Woredas Home to 9.3 Million People, FAO Says

    Drought Warning Threshold Reached in 114 Ethiopian Woredas Home to 9.3 Million People, FAO Says

    175 shares
    Share 70 Tweet 44
  • Ethiopian Airlines Faces USD 90 Million in Trapped Revenue, Half Frozen in Russia

    169 shares
    Share 68 Tweet 42
  • Over 87 Percent of Students Fail University Entrance Exam

    51 shares
    Share 20 Tweet 13
  • Ethiopia Requires BBB- Credit Rating for Foreign Banks to Enter Market

    75 shares
    Share 30 Tweet 19
  • Ethiopia at the Frontline of Global Debt

    105 shares
    Share 42 Tweet 26
The Reporter Magazine

The Reporter Magazine
Media & Communications Center
Addis Ababa, Ethiopia
(+251) 116 61 61 85
[email protected]

CATEGORY

  • Agenda
  • Art and Culture
  • Bottom Line
  • Brief
  • By the Numbers
  • Commentary
  • Dossier
  • Economy
  • Editorial
  • Ethio-Startups
  • Features
  • For the Record
  • Global Addis
  • Interview
  • Life
  • Money Talks
  • Op-ed
  • Recap
  • Sponsored
  • The Month in Brief
  • The View
  • Travel
  • Uncategorized
  • Video

Tags

Addis Ababa Afar Africa African Art Coffee coronavirus Covid-19 Cross-border economy Dallol Economy election 2020 Epiphany EPRDF Eritrean currency Erta Ale Ertale Ethiopia Ethiopia–Egypt relations Federalists GERD Global Economy GMO Gondar Gullele Botanic Garden HERITAGE Horn of Africa geopolitics IGAD Inflation Informal trade lockdown Microfinance Nakfa Nile Oscar Piazza politics Red Sea security Somalia Somaliland Startup Survival economy Tigray post-war U.S. foreign policy in Africa unemployment
  • Magazine Archive
  • Terms & Conditions
  • Privacy Policy
  • Contact Us
  • Our Team
  • About Us

Copyright © 2026 Media & Communications Center. All Rights Reserved

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Homepage
  • Interview
  • Op-ed
  • Commentary
  • The Month in Brief
  • Economy
  • Agenda
  • Life
  • Ethio-Startups
  • Art and Culture
  • The View
  • Editorial
  • Recap
  • Magazine Archive

Copyright © 2026 Media & Communications Center. All Rights Reserved